Checking out the nearly completed Math and Science building earlier this week, I couldn’t help but notice that there was something missing. Actually, there are a lot of things missing at this point, but amid the dust and debris of building crews putting the finishing touches on the main lobby, my eye was drawn to what’s not there. At the center of the lobby area, across from where crews have taken great care to install stately marble, stands an area that is clearly waiting for something. The marble, which was reclaimed from the walls of the former Baptist Hospital in downtown Knoxville, adds opulence to the building even in its unfinished state yet there is still a gaping hole.

 

The Math and Science Building lobby.

The tiled floor lays the ground work for what is to come. If you were to walk in the main entrance of the Math and Science Center today, you would see a large square with three poles waiting for something. What in the world are we waiting for? Well actually, it’s the world.

Months ago, LMU Chairman Pete DeBusk commissioned Top Stone to create a four-foot rolling sphere fountain and it’s to be installed in the lobby as soon as it arrives. The globe etched sphere can be turned, spun and stopped by hand. However, if left alone the North Pole goes back to the north position. The 5,500 pound sphere floats on a thin layer of water. Top Stones uses unique technology in their fountain. It’s surely a lesson in physics, which is only fitting for the Math and Science Center.

A globe etched stone fountain similar to this on is on its way to LMU.

Top Stone announced the shipment of the LMU fountain in a press release on May 29, 2012. The completed work has been en route every since. The extreme spring and early summer weather and storms have slowed its journey. Approximately two weeks ago, University officials were notified that it had arrived in the New York Harbor and was sitting on a shipping vessel.

We can only assume that it is now on its way to Harrogate, Tenn., by truck. With just over three weeks until LMU-DCOM Class of 2016 orientation is slated to take place in the large auditorium on the first floor of the Math and Science Building, let’s hope the world is here to greet them.

 

 

 

 